PROJECT TITLE | CLIENT NAME | CONTRACT DESCRIPTION | DURATION |
---|---|---|---|
Supply of locomotive spares | Konkola Copper Mines | Supply and deliveryof various clayton locomotive spares | 2010 and still running |
Refurbishment of Pumps | First Quantum Minerals - Kansanshi | Strip Quote and repair KSB pumps Omega 300-650 | 2011 - 2012 |
Hire Of Diesel Bowser | U&M | Supply of 2 units 20,000 Liters Diesel bowsers 3 shifts a day with operators to refuel plant equipment at the Nchanga Open Pit | 2011 - 2012 |
Hire Of water bowser | Konkola Copper Mines | Supply of Water Bowser with operators 3 shifts a day for dust suppression | 2012 - 2013 |
Supply of Propulsion units | Road Development Agency | Supply And delivery of 4 propulsion units and 2 control panels complete with cabling | 2012 |
Tramming | Konkola Copper Mines | Hauling of copper concentrates 24 hrs a Day ( 3 Shifts a Day) from West Mill Concentrator to the New Smelter. | 2012 - 2014 |
Sub- Contracted: Road Construction | Copper Fields Mining Services / Road Development Agency | Kalulushi - Lufwanyama (CH0+000 – CH 10+000) Mass earth works and pavement construction with associated drainage | 2011 - 2012 |
Sub contracted: Haulage of materials | Polokwe / Barrick Gold - Lumwana Mines | Haulage of 450,000 metric tons of aggregate Laterite and quarry dust | 2013 |
Hire of tipper trucks | Mivami Construction Limited | Supply of 8 off tipper trucks and 1 off 20,000ltr water Cart for 8 hour shift a day for road construction | 2013 - 2014 |
Sub Contructed; Road Construction | Copper Fields Mining Services / Road Development Agency | Pedicle Road (CH14+000 – CH25+200) Mass Earthworks and pavement construction and bridge construction | 2013 - 2015 |
Hire of Diesel Bowser | Konkola Copper Mines | Supply of 1 off 20,000ltr Diesel bowser with operators 3 shifts a day to refuel plant equipment at the Nchanga Open pit | 2014 - 2015 |
Tailings Reclamation | Misenge Enviromental Technical Services - Zambia Consolidated Copper Mines | Tailings Dam # 8 Mufulira Excavation, Haulage and formation of well compacted work base | 2014 |
Tailing Reclamation | Misenge Enviromental Technical Services - Zambia Consolidated Copper Mines | Tailing Dam #8 & Tailing Dam #10 Mufulira construction of gravel road to work site Excavation, Haulage, Filling of gullies and formation of well compacted work base | 2015 |
Construction of Chibalashi Dam | METS / The Ministry of Energy and Water Development | Construction of 3.1 Million Cubic Meter Dam | June 2016 to November 2016 |