PROJECT TITLE CLIENT NAME CONTRACT DESCRIPTION DURATION
Supply of locomotive spares Konkola Copper Mines Supply and deliveryof various clayton locomotive spares 2010 and still running
Refurbishment of Pumps First Quantum Minerals - Kansanshi Strip Quote and repair KSB pumps Omega 300-650 2011 - 2012
Hire Of Diesel Bowser U&M Supply of 2 units 20,000 Liters Diesel bowsers 3 shifts a day with operators to refuel plant equipment at the Nchanga Open Pit 2011 - 2012
Hire Of water bowser Konkola Copper Mines Supply of Water Bowser with operators 3 shifts a day for dust suppression 2012 - 2013
Supply of Propulsion units Road Development Agency Supply And delivery of 4 propulsion units and 2 control panels complete with cabling 2012
Tramming Konkola Copper Mines Hauling of copper concentrates 24 hrs a Day ( 3 Shifts a Day) from West Mill Concentrator to the New Smelter. 2012 - 2014
Sub- Contracted: Road Construction Copper Fields Mining Services / Road Development Agency Kalulushi - Lufwanyama (CH0+000 – CH 10+000) Mass earth works and pavement construction with associated drainage 2011 - 2012
Sub contracted: Haulage of materials Polokwe / Barrick Gold - Lumwana Mines Haulage of 450,000 metric tons of aggregate Laterite and quarry dust 2013
Hire of tipper trucks Mivami Construction Limited Supply of 8 off tipper trucks and 1 off 20,000ltr water Cart for 8 hour shift a day for road construction 2013 - 2014
Sub Contructed; Road Construction Copper Fields Mining Services / Road Development Agency Pedicle Road (CH14+000 – CH25+200) Mass Earthworks and pavement construction and bridge construction 2013 - 2015
Hire of Diesel Bowser Konkola Copper Mines Supply of 1 off 20,000ltr Diesel bowser with operators 3 shifts a day to refuel plant equipment at the Nchanga Open pit 2014 - 2015
Tailings Reclamation Misenge Enviromental Technical Services - Zambia Consolidated Copper Mines Tailings Dam # 8 Mufulira Excavation, Haulage and formation of well compacted work base 2014
Tailing Reclamation Misenge Enviromental Technical Services - Zambia Consolidated Copper Mines Tailing Dam #8 & Tailing Dam #10 Mufulira construction of gravel road to work site Excavation, Haulage, Filling of gullies and formation of well compacted work base 2015
Construction of Chibalashi Dam METS / The Ministry of Energy and Water Development Construction of 3.1 Million Cubic Meter Dam June 2016 to November 2016